Crestron Green Light
®
Power Meter Control Unit Crestron GLS-EM-MCU
10
Crestron Green Light
®
Power Meter Control Unit: GLS-EM-MCU Operations Guide – DOC. 7294B
Setup
Identity Code
The IP ID is set within the GLS-EM-MCU’s IP table using Crestron Toolbox™. For
information on setting an IP table, refer to the Crestron Toolbox help file. The IP IDs
of multiple GLS-EM-MCU devices in the same system must be unique.
When setting the IP ID, consider the following:
• The IP ID of each unit must match an IP ID specified in the SIMPL
Windows program.
• Each device using IP to communicate with a control system must have a
unique IP ID.
Installation and Wiring
For details on installation and wiring, refer to the latest version of the
GLS-EM-MCU Installation Guide (Doc. 7295), which is available from the Crestron
Web site (www.crestron.com/manuals
).
Hardware Hookup
Make the necessary connections as called out in the illustration that follows this
paragraph. Apply power after all connections have been made.
When making connections to the GLS-EM-MCU, note that the included cable cannot
be extended.
Hardware Connections for the GLS-EM-MCU
NEUT & LINE 1 - 3:
Neutral and Line
Connections from
Main Power Supply
CT1 - 3:
Input for Main Leg
Current Transformers
BRANCH CIRCUIT
MONITORS:
From GLS-EM-CTI Current
Transformer Interface
(Supplied Separately)
PULSE INPUTS:
From Programmable
Digital Inputs
USB:
To PC for Initial Setup
and Programming
LAN:
10BASE-T/
100BASE-TX
Ethernet to LAN
NOTE: To prevent overheating, do not operate this product in an area that exceeds
the environmental temperature range listed in the table of specifications.