CRESTRON: GREEN LIGHT NETWORK LIGHTING CONTROLS 26 09 43 - 14
C. Install network power switching controls in accordance with manufacturer's instructions.
D. Grounding: Provide electrical grounding in accordance with NFPA 70.
E. Provide panelboard schedule in pocket provided in panel doors.
3.3 SOFTWARE
A. Install and program software to meet the Owner's requirements. Provide current licenses. And
backup copies of the software for the Owner's records.
3.4 SYSTEM STARTUP
A. Provide manufacturer's system startup and adjustment.
B. Switch each load on and off with manual line test feature of the power switching module before
installing processors.
C. Perform operational testing to verify compliance with Specifications. Adjust as required.
3.5 ADJUSTING
A. Within 12 months of the date of Substantial Completion provide onsite service to adjust the
system to account for actual occupied conditions.
3.6 DEMONSTRATION
A. Factory authorized service representative to instruct owner's staff to adjust, operate and
maintain network power switching systems; and provide instruction using the system software.
3.7 CLOSEOUT ACTIVITIES
A. Demonstration: Schedule demonstration with Owner.
B. Training: Train Owner's personnel to operate, maintain, and program network power switching
systems. Allow for a minimum of trips to the jobsite to provide additional training as needed.
1. Furnish set of approved submittals, and record drawings of actual installtion for Owner's
personnel in attendance at training session.
END OF SECTION 26 09 43